Step 1 : INSTALLATION MARKING
Trace horizontal line using a level to determine the height of your different units (at 78" 3/4 or (200.5 cm) for a Medicine cabinet without header).

Step 2 : MARKING STUD LOCATIONS
Mark location of studs using a level or measuring tape.
Use vertical lines to identify stud locations to solidly fasten units on the wall.
Pro’s advice :
As a General rule, studs are usually spaced at 16” (41 cm) in recent buildings and 12” (30.5 cm) for older ones.

Step 3 – REMOVING DOORS
MARKING DOORS AND DRAWERS
Use a phillips screwdriver to remove all the doors from the units especially the cabinet doors. Make sure to mark them because you must reinstall them at their original location.

Step 4 – LEVELING
Make sure that the unit is leveled at the front and on the sides. If necessary, you can use cedar wedges.

Step 5 - DOORS INSTALLATION
Re-install the medicine cabinet doors.

Step 6 – INSTALLING ACCESSORIES AND CLEANING UNITS
Clean the units using a non-abrasive cleaning product. Install knobs or handles, faucet, lights, etc.
