Installation of linen tower

Step 1 - GETTING STARTED

Find the highest area of the floor using a « level ».



Step 2 - INSTALLATION POINT

Then, trace a horizontal line using a level to adjust height of your different units (31 1/2” or 80.5 cm for a vanity).



Step 3 - MARKING STUDS LOCATIONS

Trace horizontal lines as displayed here, using a level or measuring tape, to mark stud locations.

Use vertical lines to identify studs to firmly anchor units on the wall.

Pro's advice:
As a general rule, studs are usually spaced at 16” (41 cm) in recent buildings and 12” (30.5 cm) for older ones.

   


Step 4 - LEVELING

Make sure the unit is level at the front and on the sides. If necessary, you can use cedar wedges.


Step 5 - ANCHORING TO THE WALL

Anchor the vanity to the wall using « #8 2 ½’’ to 3’’» wood screws with the wood crosspiece at the back of the vanity.



Step 6 - ANCHORING ALL UNITS

You can use « metal or plastic grips » to help you align all your units. Anchor them with « #6 1 1/8’’» melamine screws.


Step 7 - INSTALLING ACCESSORIES AND CLEANING THE UNITS

Using a non-abrasive cleaning product, clean the units. Install knobs or handles, faucet, lights, etc.


Contact our closest distributor !

Enter your zip code :